Elliott Group Brochure ROI 052022 T.2 - Flipbook - Page 79
Elliott Group | A Tradition in Construction
Cavan | Dublin | Cork | London | Birmingham
Stephenson House
Milton Keynes
All nine 昀氀oors had existing façade which was not
compliant with the latest building regulations
due to missing vertical and horizontal 昀椀re
barriers, the use of PIR insulation and the
facade being made from a non 昀椀re compliant
Aluminium Composite Material (ACM)
The scaffolding was designed by our scaffolding
subcontractor and cross-checked by our
independent scaffolding structural engineer
before being certi昀椀ed with a temporary works
category three check certi昀椀cate.
To achieve compliance:
+ All existing cladding was removed from
the top down.
+ A new 昀椀re compliant aluminium 昀椀xing
system & stone wool insulation was
昀椀tted.
+ A new A2-S1-d0 昀椀re rated, acoustic compliant and thermally improved cladding
was installed.
Elliott Group management and staff were
involved from tender to handover. The aim of
these construction works was for the building
owner and residents to achieve an EWS1 form.
All 昀椀xings installed & 昀椀re barriers 昀椀tted were
photographed and recorded on Procore which
was used as a handover document and O&M
昀椀le at completion stage.
Value
£3,400,000
Client
Stephenson House Man
Company Ltd. / CBRE
Location
Milton Keynes
Programme
30 weeks
elliottgroup.com