Canary Riverside | PCSA Stage
46 Westferry Circus, Canary Wharf, London
The scheme ranges from six to twenty-two
昀氀oors and had several existing façade types
which were not compliant with the latest building
regulations due to missing cavity closers, 昀椀re
barriers, 昀氀ammable insulation and the facade
being made from a non 昀椀re compliant insulation,
insulated render & zinc cladding.
photographed and recorded on Procore which
was used as a handover document and O&M
昀椀le at completion stage.
To achieve compliance:
+ All non-compliant cladding was removed
from the top down.
+ A new 昀椀re compliant zinc cladding &
昀椀xing system was 昀椀tted.
+ Existing render removed and replaced
with a 昀椀re compliant insulated render.
+ Spandrel panels were removed and cavity barriers 昀椀tted
Elliott Group management and staff were
appointed at a PCSA stage and brought the
project through to handover. These construction
works was for the building owner and residents
to achieve an EWS1 form.
All 昀椀xings installed & 昀椀re barriers 昀椀tted were
Value
£10,400,000
Client
Canary Riverside Man/Calford
Seaden
Location
Canary Wharf
Programme
62 weeks