University Hospital Galway
Galway
This project consisted of the construction of a
new 75 Bed Ward Block as an extension on to the
existing live acute University Hospital Galway.
KEY FEATURES
All works that interfaced with the hospital were
carried out under method statement and work
permits. We used an LOD 350 BIM model to
coordinate the services even though it was not a
contractual requirement. All M&E systems were
agreed via technical submittal process.
6 isolation rooms
75 Bed Ward Block
Workshops were held on all critical systems with
the hospital maintenance and end user staff.
Technical submitted on all packages on the
project in order to en-sure compliance with the
works requirements. A sample/mock-up room
was constructed at the start of the project in order
to agree details.
The roof of the building consisted of an enclosed
plant room which was weather with mastic
asphalt. The plant room housed all AHU’s, Vac
plant, Boiler house, CHP, Chillers and coms room.
The 75 rooms were all 18m2 single bed rooms
with 8m2 ensuite bathrooms. The project also
consisted of 6 isolation rooms.
Client:
HSE
Start Date:
June 2015
End Date:
October 2016
Cost Consultants:
Aecom
Architect:
Maloney O’Beirne
Architects
Structural Engineer:
RPS
Services Consultant:
Varmings
VALUE
SIZE
€15,000,000
75 Bed ward
PROJECT TYPE
DURATION
PWC 4
26 Weeks