Our Lady of Lourdes Hospital
Drogheda, Co. Louth
Phase 2 project consisting of A&E at ground 昀氀oor
level, Ward beds at level 2,3 &4 and level 5 will be
operating theatres. All plant is at roof level both
indoors and out door.
A 6 storey dust screen was installed in front of
the hospital as part of the aspergillus prevention
measures. Temporary retaining works were
carried out to existing services and a di-version
of Foul, ESB, medical gases and coms had to be
undertaken before any foundations started. Toilets
on the ground 昀氀oor of the existing A&E department
had to be relocated as part of the enabling works.
The entire facade of the building was made up
of a Argeton Terracotta rain screen and Schucco
curtain walling. The panel support rails were 昀椀tted
in conjunction with the windows being installed. A
structural steel bridge link was also constructed
over the existing hospital and linked Phase two
with Levels 6, 7 & 8 within the existing hospital.
The link was then cladded in Structural Curtain
walling.
Client:
HSE
Start Date:
March 2016
End Date:
September 2018
Cost Consultants:
Thomas D’Arcy & Co.
Architect:
WA Architects
Structural Engineer:
O’Connor Sutton Cronin
Services Consultant:
Varmings Consulting
Engineers
KEY FEATURES
A 6 storey dust screen was installed
Argeton Terracotta rain screen
installed on facade
Structural steel bridge link
VALUE
SIZE
€40,000,000
9,000m2
PROJECT TYPE
DURATION
PWC 4
104 Weeks