HSE, Cavan Primary Care Children’s Service
HSE, Cavan Primary Care Children’s Service
95 Main Street Cavan
95 Main Street Cavan, a late 20th-century building,
was revitalized through a complete strip-back and
redevelopment. Collaboration with the HSE estate
agent and clinic end-user representative was
crucial to the internal design.
KEY FEATURES
Large carpark to rear
Retention of existing facade
Key Requirements & Challenges
Located on Cavan’s main street, the building’s age
and character had to be preserved while adapting
it for primary care. The location and one-way
traf昀椀c presented logistical challenges. Structural
and 昀椀re safety upgrades were essential due to the
building’s condition.
an Primary Care Children’s Service 2FNS8YWJJY(F[FS
Design
The building was gutted and retro昀椀tted to meet
HSE energy standards. The ground, 昀椀rst, and
second 昀氀oors were refurbished with clinical
rooms, admin of昀椀ces, a reception, staff facilities,
and accessible toilets. The front façade insulation
was upgraded internally, while other elevations
received external insulated render. All external
doors and windows were replaced, and a full
M&E upgrade was completed. A new ESB mains
connection required road opening and traf昀椀c
management.
Client:
HSE
Start Date:
September 2023
End Date:
March 2024
VALUE
SIZE
€2,900,000
12,073 sq. ft.
PROJECT TYPE
DURATION
PWC 4
28 Weeks
Cost Consultants:
Architect:
MFA
Structural Engineer:
Alan Traynor Engineers
Services Consultant:
Renaissance Engineering
elliottgroup.com
Click to Play Video
(QNJSY
-8*(F[FS5WNRFW^
Care Children’s
8JW[NHJ
;FQZJ
€3,000,000
8N_J
XVKY
)ZWFYNTS5WJ(TS–
JJPX
)ZWFYNTSTSXNYJ–
JJPX
5WTOJHY2FSFLJW
568
*QQNTYY,WTZU
&WHMNYJHY
2+&
8JW[NHJX
(TSXZQYFSY
7JSFNXXFSHJ
*SLNSJJWNSL
8YWZHYZWFQ (N[NQ
*SLNSJJWNSL
&QFS9WF^STW
*SLNSJJWX
&XXNLSJI(JWYNKNJW
2+&