Connolly Hospital A&E Department
Dublin
This project involved a single-story extension
to Connelly Hospital’s emergency department,
adding an isolation room suite and two emergency
resuscitation rooms, along with ancillary rooms,
as part of COVID emergency measures. Using
the Elliott Fast Track construction solution,
which includes a raft slab and prefabricated SFS
loadbearing structure with an SFS roof truss buildup, we mobilized on-site within two weeks.
KEY FEATURES
Fast track Construction
Works executed during national Covid
19 lockdown
The building’s external envelope features A1
Classi昀椀ed rockwool insulation render. The roof’s
tapered insulation system was completed in
昀椀ve days, making the building weather-tight and
ready for internal installation within 15 days of
slab pouring. The entire project was completed
in 22 weeks from start to handover, maintaining
the high standards required for an emergency
department.
VALUE
SIZE
€2,900,000
Client:
HSE
Start Date:
October 2019
End Date:
January 2021
Cost Consultants:
Desmond MacGreevy
& Partners
Architect:
MCA Architects
Structural Engineer:
Lohan & Donnelly
Services Consultant:
Varming Engineering
PROJECT TYPE
DURATION
PWC 4
22 Weeks