Elliott Group Brochure ROI 052022 T.2 - Flipbook - Page 64
Elliott Group | A Tradition in Construction
Cavan | Dublin | Cork | London | Birmingham
Dairygold, Laboratory
Mitchelstown, Co. Cork
This project entails repurposing a previously
unused backup electricity generation building into
a state-of-the-art Laboratory and Testing Facility.
This new facility will support and enhance the
operations of Dairygold Food Ingredients Milk
Processing. The scope of the project includes the
partial demolition of an existing generator room
to create a new ground 昀氀oor storage area.
On the 昀椀rst 昀氀oor, the facility will feature a
comprehensive suite of specialized rooms and
amenities. These include a designated sample
drop-off area, a laboratory store room, a fully
equipped laboratory area, a gowning room for
proper laboratory attire, an incubator room for
controlled environment testing, and various staff
facilities to ensure a comfortable and ef昀椀cient
working environment.
Overall, the transformation of this building
will signi昀椀cantly contribute to the ef昀椀ciency
and capability of Dairygold’s milk processing
operations.
Client:
Dairygold Food
Ingredients Ltd.
Start Date:
November 2022
End Date:
February 2023
Cost Consultant:
ECP
Architect:
OLS
Structural Engineer
OLS Consultant Eng
Services Consultant:
EDC
Contract Type:
RIAI Contract
KEY FEATURES
State-of-the-art laboratory
State-of-the-art testing facility
An incubator room for controlled
environment testing
A designated sample drop-off area
An incubator room
VALUE
SIZE
€800,000
1000m2
PROJECT TYPE
DURATION
Private
14 Weeks
elliottgroup.com