Elliott Group Brochure ROI 052022 T.2 - Flipbook - Page 60
Elliott Group | A Tradition in Construction
Cavan | Dublin | Cork | London | Birmingham
Cadant Gas | Live Project
Uxbridge Road, Slough
The project is situated on Cadent Gas’ site. Polygon
House and Brunel / Murdoch House were demolished
to enable site recon昀椀guration. Cadent also acquired
the former location of a gasholder to the Northwest,
now used for the pipe store adjacent to the Above
Ground Installation(AGI).
New Of昀椀ce Building
Of昀椀ce space is spread across two 昀氀oors with WCs
and staff welfare facilities. The core features a
wheelchair accessible lift and main stairs extending
to the roof for plant enclosure and PV panel access,
surrounded by a 1.3m parapet wall.
5 STAR RATING
KEY FEATURES
New Of昀椀ce Building
New of昀椀ce Building 2358m2 over two
storeys
A reception, and adjacent meeting
rooms
Store & Workshops Building
New stores and workshop building
of 1230m2 of ground 昀氀oor and
mezzanine 昀氀oor.
Store & Workshops Building
The store and workshop building consolidates
maintenance equipment currently dispersed across
the site. Its functional design includes a mezzanine
for storage, of昀椀ce spaces, and welfare facilities to
support larger areas.
Client:
Cadent Gas Ltd
Start Date:
June 2023
End Date:
November 2024
VALUE
SIZE
£18,500,000
3,588 m2
PROJECT TYPE
DURATION
Private
70 Weeks
Cost Consultant:
Architect:
AWW
Structural Engineer
CWA Engineering
Services Consultant:
HDR
Contract Type
JCT Design & Build
Click to Play Video