Cavan | Dublin | Cork | London | Birmingham
DUB10 ESB GIS Substation
Dublin
All CSA works associated with the construction
of an ESB 110kV Gas Insulated Substation for the
use by Echelon Data Centres in support of the
development and to incorporate an ESB Network
Substation to improve and upgrade power supply
to Clondalkin and adjoining areas.
KEY FEATURES
The ESB 110kV Gas Insulated Substation is a two
storey building of gross 昀氀oor area of 1,586sq.m
and Client Control Room building of an area of
116sq.m; single storey 2MV ESB Substation of
38sq.m 昀氀oor area constructed to facilitate the
construction of the ESB 110kV GIS Substation,
including for 3 ESB external transformers and 3
Echelon external transformers; alterations include
for the relocation on site of previously granted
client transformers, control building and energy
centre ancillary building to facilitate the revised
ESB 110kV Substation building layout.
Client Control Room
ESB Substation and client control building and
transformer compound are secured with a 2.6m
and 3m high palisade fence and access gates; all
landscaping and ancillary site works.
Client:
Echelon Data Centres
Start Date:
February 2022
End Date:
Cost Consultant:
Arcadis
Architect:
Kavanagh Tuite &
ARC MC
Structural Engineer:
Atkins Realis
Services Consultant:
PPS Services Group
GIS Substation
CSA Package
110kV Gas Insulated Substation (GIS)
3 ESB external transformers
3 Echelon external transformers
VALUE
SIZE
€3,600,000
80MW
PROJECT TYPE
DURATION
Private
10 Months
elliottgroup.com