Athlone GIL Peaker Power | Live Project
Athlone, Roscommon, Ireland
All CSA works associated with the construction of
a 100MW gas 昀椀red power plant with associated
balance of plant, equipment and buildings including
an Engine Hall Building (comprising 10 no. gas
engines; ventilation units, cooling radiator units and
2 no. 27m stacks), an Electrical Annex Building, a
110kV Electrical Substation and Control Building
a Gas AGI including an Instrument House, an
Administration Building, a Workshop/storeroom, a
Tank Farm (consisting of a Diesel Oil Storage Tank),
Urea Storage Tank, Waste Oil Tank, Pilot Oil Tank,
Lube Oil Storage Tank, and a Lube Oil Run-Down
Tank an Engineering Building, a Raw/Fire Water
Storage Tank, Treated Water Tank, Cooling Water
Run-Down Tank, an underground Surface Water
Attenuation Tank and an underground wastewater
holding tank.
The development will also include an access
road onto an existing road with access via the
Monksland Industrial Estate; 13 no. car parking
spaces; footpath; landscaping, 3m paladin security
fence; and all other associated site development
works including surface water and foul drainage
required to facilitate the development.
KEY FEATURES
Engine Hall
Electrical Annex
Tank Farm
Gas AGI
2 no. Electrical Transformers
Radiator Coolers
Roads, paths & paving
Undeground utilities
Elliot Group Role on the Project:
Elliott Group acted as the Civil, Structural, Architectural
(CSA) Specialist Package Contractor (SPC) on the project.
VALUE
SIZE
€15,000,000
100MW
PROJECT TYPE
DURATION
Private
60 Weeks
Management of Stakeholder Interfaces:
Elliott Group worked with GAMA who are the Project
Management Consultancy (PMC) on the project.
Design & Build Responsibilities :
Client:
Centrica Business
Solutions
Start Date:
April 2023
End Date:
June 2024
Cost Consultant:
GAMA
Positivite Contributions to Project:
Architect:
GAMA
Structural Enginner:
GAMA
Services Consultant:
GAMA
We have ensured all CSA packages were delivered
on time to compressed timeframes to the highest
standards of safety and quality. We have also provided
all logistics & site accommodation incl. contractors
village to the project.
Our scope of works includes Contractor Design Portion
(CDP) for all rebar detailing, temp works, product
technical submittals and concrete mix design.
Click above to Play Video