Pro昀椀le Park Power Plant | Live Project
Dublin
All CSA works associated with the construction
of a gas 昀椀red power plant with an electrical
output of up to 125MW with associated balance
of plant, equipment and buildings including; an
Engine Hall building comprising 6 gas engines
and ancillary infrastructure; an Electrical Annex
Building; a Workshop building; a Tank Farm
building; a Security hut; an Exhaust Stack; a Gas
AGI including a kiosk.
KEY FEATURES
Radiator Coolers; 2 electrical transformers;
Tanks including 2 x Diesel Oil Storage Tanks;
SCR Urea Tank; Lube Oil Storage Tank; Lube Oil
Maintenance Tank; Pilot Oil Tank; Fire Water
Storage Tank; Ef昀氀uent Collecting Tank (26m3);
Underground Surface Water Attenuation Tank;
2 new access points onto the existing private
road network with Athlone; 12 parking spaces,
footpaths, landscaping; fencing and all other
associated site development plant and equipment
and other works including surface water and foul
wastewater drainage.
Radiator Coolers
Engine Hall
Electrical Annex
Tank Farm
Gas AGI
2 no. Electrical Transformers
Roads, paths & paving
Undeground utilities
Elliot Group Role on the Project:
Elliott Group acted as the Civil, Structural, Architectural
(CSA) Specialist Package Contractor (SPC) on the project.
VALUE
SIZE
€15,000,000
100MV
PROJECT TYPE
DURATION
Private
69 Weeks
Management of Stakeholder Interfaces:
Elliott Group worked with GAMA who are the Project
Management Consultancy (PMC) on the project.
Client:
GAMA
Start Date:
April 2023
End Date:
June 2024
Cost Consultant:
GAMA Ltd
Architect:
GAMA Ltd
Structural Engineer
GAMA Ltd
Services Consultant:
GAMA Ltd
Contract Type:
Nec4
Design & Build Responsibilities :
Our scope of works includes Contractor Design Portion
(CDP) for all rebar detailing, temp works, product
technical submittals and concrete mix design.
Positivite Contributions to Project:
We have ensured all CSA packages were delivered
on time to compressed timeframes to the highest
standards of safety and quality. We have also provided
all logistics & site accommodation incl. contractors
village to the project.
Click to Play Video
elliottgroup.com