DUB10 Energy Centre | Live Project
Dublin
All CSA works for constructing an energy centre
in the western part of the site, featuring 10 gas
turbines, 2 steam turbines with 2 steam generator
enclosure buildings, associated steam turbine
generator distribution and control structure,
and 2 no. steam turbine / air cooled condenser
structures. Construction of 8 transformer bays
(33/20kV) to the southeast and 12 gas/steam
transformers to serve turbines to the west.
Includes 3 high fuel storage tanks, a fuel oil
enclosure, a 昀椀re pump enclosure, sprinkler tanks,
a water tank, and a water treatment plant.
Provision of 6 black-start/emergency generators
to the south of the energy centre, a single-storey
powertrunk building to the southeast, a 3-storey
medium/low voltage building to the southwest,
and 2 transformers near the substation.
Provision f a Gas AGI (above-ground installation)
in a fenced compound to the southwest with
a control room, plant kiosk, and boiler house.
Includes landscaping, parking (18 car spaces
and bicycle parking within bicycle shelter), road
layouts, lighting, drainage, ancillary works and all
related works.
Client:
Echelon Data Centres
Start Date:
Feburary 2023
End Date:
March 2025
Cost Consultant:
Arcadis
Architect:
Kavanagh Tuite &
ARC MC
Structural Engineer:
Atkins Realis
Services Consultant:
PPS Services Group
KEY FEATURES
10 no. gas generation turbines
2 no. steam turbine generator
enclosure buildings
2 no. steam turbine / air cooled
condenser structures
8 no. 33/20kV transformer bays
12 no. gas / steam transformers
3 no. 13.6 m high fuel storage tanks
Fuel oil enclosure building
Fire pump enclosure building
Single storey over basement level
powertrunk building
3-storey over basement MV / LV
building
VALUE
SIZE
€60,000,000
200MW
PROJECT TYPE
DURATION
Private
105 Weeks
Click to Play Video