The Belfry, Guest Bedrooms
Sutton Cold昀椀eld, Birmingham
Bedroom Refurbishment
KEY FEATURES
The existing rooms lacked natural light, so the
interior design was conceived to brighten the
rooms.
All 325 bedrooms and associated corridors were
to undergo a full refurbishment, ensuring guests
enjoy the highest standards of comfort and luxury.
Full refurbishment of all 271 bedrooms
and associated corridors.
The project accounted for 39 different room
layouts and sizes, including 27 individual suites.
With forward bookings aligning with the project
timeline, there was no margin for delays. The
hotel aimed to maintain 90% capacity during the
refurbishment.
All rooms were surveyed in advance to identify
issues and snags from previous works. The
project manager devised a unique programme
for 24 rooms, with 4 rooms being handed over
daily. The programme detailed 130,000 actions,
scheduled hour by hour. Each room followed a
speci昀椀c pattern, allocating time slots for each
trade to complete their tasks before moving to the
next room.
The entire project maintained strict timelines,
completing all tasks on time and within the
program, ensuring zero snags upon completion.
This included 39 different layouts and 27
individual suites
Achieved 27 completions in 5 months, all
on time with zero snags at handover, while
the hotel operated at 90% capacity.
Our Project Manager Paddy O’Connor has been awarded
the Fit Out Project Manager Of The Year 2024 for his
dedication and excellent work on The Belfry Hotel
VALUE
SIZE
£4,500,000
325 Bedrooms
PROJECT TYPE
DURATION
Private
12 Months
(phased)
Client:
Cedar Capital Partners
Project Managers:
Amicus
Interior Architects:
Fusion Interiors Group
Cost Consultant:
Amicus
Architect:
EPR
Structural Engineer
EXP
Services Consultant:
Hoare Lea